Drop City Substation

Drop City, CO
November 2009 – Current

The design of a 115 kV substation with 12.47 and 24.5 kV distribution voltages. Each distribution voltage has four exit circuits. The project was based on an EPC contract with San Isabel Electric Association, Inc. to perform design and construction services. Construction is being performed by Ward Electric.

Vibram Five FingersFive fingers shoesVibram 5 Fingersvibram fivefingers5 finger shoesmulberry alexagucci handbagsralph lauren outlet

Beech Ridge Wind Project 138 kV Transmission Line

Beech Ridge, WV
March 2009 – November 2009

Approximately 14 miles of 138 kV overhead transmission line in mountainous terrain to deliver power from a newly constructed wind farm. The line consists of direct embedded weathering steel structures with brace post insulators. Considerations specific to this project included the design of a self supporting switch structure and accounting for subsurface conditions that alternated between mine spoils and rock.

Vibram Five FingersFive fingers shoesVibram 5 Fingersvibram fivefingers5 finger shoesmulberry alexagucci handbagsralph lauren outlet

Great Pains Wind Farm 115kV Transmission Line

Gruver, Texas
February 2008 - November 2008

3.5-mile, 115kV overhead transmission line to deliver power from newly constructed wind farm. Consists of single wood pole structures with polymer post insulators. EPC contract with Signal Wind Energy to perform design and inspection services.

Vibram Five FingersFive fingers shoesVibram 5 Fingersvibram fivefingers5 finger shoesmulberry alexagucci handbagsralph lauren outlet

Bartow 230kV Substation

St. Petersburg, Florida
March 2007 - December 2008

Four circuit addition to existing Bartow Substation to power underground 230kV addition. Consists of aluminum ring bus with steel support structures. Project also included overhead transmission tie-lines to connect to new combined cycle power plant.

Vibram Five FingersFive fingers shoesVibram 5 Fingersvibram fivefingers5 finger shoesmulberry alexagucci handbagsralph lauren outlet

Bartow - Northeast 230kV Underground Project

St. Petersburg, Florida
March 2007 - December 2008

Four circuit, 4-mile concrete encased duct bank project utilizing 5,000 kcmil XLPE cable. Duct bank consisted of sixteen, 8-inch PVC conduits. Project also encompassed various boring techniques including Jack and Bore, Microtunnel, and Horizontal Directional Drilling.

Vibram Five FingersFive fingers shoesVibram 5 Fingersvibram fivefingers5 finger shoesmulberry alexagucci handbagsralph lauren outlet